Choosing a project type

The four ways a plant can be built around the battery, and what each one enables or disables in the input tabs.

On the ๐Ÿ“‚ Data tab, a radio group sets the plant's topology โ€” which generation sources feed the battery, if any. The choice changes which inputs are active across the rest of the input notebook. The default, ticked at launch, is 3. Solar + Wind + BESS.

The four project type options on the Data tab, with Solar + Wind + BESS selected.
The project type radio group

The four project types

Project typeWhat it does
1. Solar + BESSWind is pinned to 0 MW; the Wind sizing, CAPEX and O&M inputs are disabled.
2. Wind + BESSSolar is pinned to 0 MW; the Solar sizing, CAPEX and O&M inputs are disabled.
3. Solar + Wind + BESS (default)Both sources are active.
4. Standalone BESS (grid-charged)Solar and Wind are both pinned to 0 MW, with their sizing, CAPEX and O&M inputs disabled; the generation-profile loader on the ๐Ÿ“‚ Data tab is disabled too โ€” the app builds a one-year, 15-minute calendar internally instead of reading a file; the Peak-Shift dispatch checkbox is disabled and forced off.

Generation-charged Peak-Shift dispatch

Beneath the radio group, a checkbox turns on Peak-Shift dispatch โ€” off by default, and disabled for Standalone BESS. Its exact label follows the topology you picked:

Project typeCheckbox label
1. Solar + BESSSolar-charged Peak-Shift dispatch
2. Wind + BESSWind-charged Peak-Shift dispatch
3. Solar + Wind + BESSSolar+Wind-charged Peak-Shift dispatch

With it ticked, generation charges the battery first, and any surplus beyond that is exported straight away. The battery only discharges inside the Peak window you set on the โฐ Peak tab, to meet the Contracted Capacity (CC โ€” the firm load the plant is obligated to serve) there โ€” outside that window there is no delivery obligation, and so no shortfall penalty, whatever the battery is doing.

Left off, the ordinary Peak/Off-Peak dispatch applies instead: on Peak hours the battery discharges first and any excess generation then charges it; on Off-Peak hours the battery charges first and the remainder of generation meets the CC.

Where to go next

On this page